Research Topic

Schedule

18 Publications Matching this Keyword

Impact Factor
7.883
Schedule

18 Matching Papers


All Categories
Publish Your Paper

Submit your research manuscript for fast peer review and publication.

Submit Paper

Papers tagged with "Schedule"

Showing page 1 of 2
Vol 12, Issue 9 (September 2026) CIVIL ENGINEERING

PLANNING AND SCHEDULING OF A COMMERCIAL G+6 BUILDING PROJECT USING MANAGEMENT TOOL

Buildings Are Constructed And Managed Differently As Cities Continue To Expand, And Project Complexity Keeps Rising Dramatically. A Key Idea To Take Into Account For A Successful Construction Project's Execution Is Planning And Scheduling....

Kumari Poonam Saket, Praveen Ghidode
Vol 11, Issue 6 (June 2025) Civil Engineering

Enhancing Efficiency Through Strategic Equipment Management In Highway Construction

Highway Construction Projects Are Capital-intensive, With Equipment Management Playing A Pivotal Role In Determining Project Efficiency, Cost-effectiveness, And Timely Completion. This Thesis Investigates The Enhancement Of Operational Effi...

Vaibhav Sonone, Pranav Lende
Vol 11, Issue 3 (March 2025) Corporate Secretaryship

A STUDY ON EMPLOYEE SATISFACTION AND ITS EFFECTS ON THE WORK PERFORMANCE OF CROMA IN COIMBATORE

This Study Explores The Relationship Between Employee Satisfaction And Work Performance At Croma, A Leading Retail Brand, In Coimbatore. The Research Aims To Understand How Various Factors Of Employee Satisfaction, Such As Job Security, Wor...

Dr. A. R. Kanagaraj, Abdur Rahman N
Vol 11, Issue 3 (March 2025) Arts

A STUDY ON FLEXIBLE WORKING HOURS AND IT’S IMPACT ON EMPLOYEE PERFORMANCE WITH REFERENCE TO SELECTED COMPANIES IN TIDEL PARK – COIMBATORE

Flexible Work Schedules Have Become A Crucial Component Of Modern Corporate Life, Impacting Both Organizational Productivity And Employee Performance. This Study Looks At How Flexible Work Hours Affect Workers' Productivity, Job Happiness,...

Dr.A.R.Kanagaraj, Jishaa. S
Vol 10, Issue 6 (June 2024) MBA

AN ANALYSIS OF WORKING CAPITAL MANAGEMENT WITH REFERENCE TO G.V INDUSTRIES

This Study Hasbeen Enriched In “G.V. INDUSTRIES, CHENNAI”. Analysis The “working Capital Management”. Working Capital Management Involves The Relationship Between A Short-term Assets And Short-termliabilities, The Goal Of Working Capital Ma...

T.Abinaya, Dr. S. Rathika, Dr. R. Jayadurga
Vol 10, Issue 4 (April 2024) Information Technology

Task scheduling using enhanced sunflower optimization in cloud environment

The Abstract Commences By Introducing The Importance Of Task Scheduling And The Obstacles Associated With It. It Emphasizes The Necessity For Effective Optimization Methods To Tackle The Complexities Arising From Elements Such As Task I...

Parkavi.B, Anushiya.R, Ilakiya.R, Dr. M. Suresh Kumar
Vol 9, Issue 7 (July 2023) Construction Engineering Management

AN EVALUATION OF EARNED VALUE ANALYSIS IN RESIDENTIAL AND COMMERCIAL BUILDING PROJECTS: A REVIEW

This Review Paper Explores The Application And Benefits Of Earned Value Analysis (EVA) In Residential And Commercial Building Projects. EVA Is A Project Management Technique That Integrates Cost, Schedule, And Scope Metrics To Evaluate Proj...

Milind Laxman Kambli, Mr. Pranav K. Lende
Vol 6, Issue 6 (June 2020) Civil Engineering

ASSESSMENT OF WATER SUPPLY MANAGEMENT FOR PMC AREA

One Of The Problems For Water Supply Systems With Intermittent Supply Is The Peak Flow Produced At Some Hours Of The Day, Which Is Usually Much Larger Than That In A System With Continuous Supply. The Main Consequence Is The Reduction Of Pr...

Mr. Pradip K. Patil, Prof. Milind M. Darade
Vol 6, Issue 2 (February 2020) COMPUTER ENGINEERING

CAR-SERVICE-SPA

We Are Facing Many Problems While Servicing Our Vehicle Like Sometimes Companies Do Not Provide Online Facilities, People Have To Go To Their Respective Showrooms Only, Sometimes People Lost Their Service Book. Well, We Have/had A Solution...

Kanan Patel, Nidhi Patel, Prof. Ajaykumar T. Shah
Vol 5, Issue 6 (June 2019) Civil Engineering

EARNED VALUE ANALYSIS & ESTIMATION OF TWIN BUNGALOW BY USING MSP

Construction Industries Are Facing Challenges Day By Day. Amidst All These Challenges It Is Very Crucial To Improve The Performance Of A Project With Respect To Schedule And Cost. Forecasting Provides A Reasonable & Uniform Approach For Pro...

Ms. Shweta B. Kashid, Prof. Sagar S. Ambure
Vol 4, Issue 4 (April 2018) Electronics &Telecommunications

SUBSTATION AUTOMATION USING PLC AND SCADA

Electrical Power Systems Are A Technical Wonder. Electricity And Its Accessibility Are The Greatest Engineering Achievements Of The 20th Century. A Modern Society Cannot Exist Without Electricity. Smaller Power Systems (called Regional Grid...

Prof. ChandrakantBhange, Dhanashree N. Ghate, ShantanuH. Salunkhe, Shubham S. Bhuwad
Vol 4, Issue 2 (February 2018) Electronics And Communication Engineering

INTELLIGENT DETECTION AND ELIMINATION OF BLOCKAGE IN PIPE USING ROBOT MECHANISM

This System Presents Arranging Procedures For Automated Cleaning Of Stains On Non-planar Surfaces. Access To Various Bits Of The Stain May Require Visit Repositioning And Reorienting Of The Question. Around The Globe, There Are A Large Numb...

K.Meera, R.Gayathri, N.Kokila, N.Lavanya, S.Jeya Anusuya
Vol 3, Issue 10 (October 2017) Civil Engineering

WASTE MINIMIZATION OF STEEL USING BBS MODULE

Today, In Modern Times, Attempts Are Made To Integrate Various Departments In A Project To Avoid Duplication Of Information, Avoid Errors, Keep Track Of The Money And Efficient Management. The Major Material Used In Construction Project Is...

Ashwini Patil, Shraddha Syal
Vol 3, Issue 7 (July 2017) Civil Engineering

TRACKING OF CONSTRUCTION PROJECTS USING EARNED VALUE ANALYSIS

Earned Value Method Is The Well Known Project Management Tool. It Is Used To Establish The Current Status Of The Project With The Help Of Information Gathered Such As Information On Cost, Schedule And Work Performance. The Key Parameters Fr...

Vishal S Vadje, Prof. S. S. Pimplikar
Vol 3, Issue 6 (June 2017) Mechanical Engineering

DEVELOPMENT OF MATERIAL REQUIREMENT PLANNING IN SMALL SCALE INDUSTRY: A CASE STUDY

Materials Requirement Planning (MRP) Is A Method To Determine What, When, And How Much Component And Material Are Required To Satisfy A Production Plan Of End Products Over Time. An MRP System Is A Widely Used Method For Production Planning...

Yateshwar Singh Verma, Dehal Ram Nishad

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!