Impact Factor: 7.883
Submit Paper
Volume 4, Issue 6 (June 2018)

Study Of Factors For Cost Overrun In Road Construction Projects

Impact Factor
7.883
Call For Paper
Volume 12 Issue 10

October 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Amol A. Shinde Pravin Minde

Abstract

The Subject Of Project Cost And Time Over-run Has Presently Dragged A Widespread Attention Of Project Managers And The Other Project Related Personnel. An In-depth Study And Critical Analysis Of Cost-time Figures Might Be Able To Decide Whether The Outwar


Keywords

Cos Toverruns; Cost Time Figures ;hierarchy.

Paper ID

IJSARTV4I623915

Publication Date

June 3, 2018

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!