Impact Factor
7.883
Call For Paper
Volume 12 Issue 10
October 2026
Author(s)
Mr. Pranav K. Lende Prof. Aradhana D. Rathod
Abstract
India Has A Road Network Of Over 4,236,000 Kilometers In 2011, The Third Largest Road Network In The World. At 0.66 Km Of Roads Per Square Kilometer Of Land, The Quantitative Density Of India's Road Network Is Similar To That Of The United States (0.65) A
Keywords
Cos Toverruns; Road Construction Projects ; Quantitative Density ; Time And Quality.
Paper ID
IJSARTV4I422194
Publication Date
April 1, 2018
Research Area
Civil Engineering