Impact Factor
7.883
Call For Paper
Volume 12 Issue 10
October 2026
Author(s)
Prof. P.K.Lende Mayavati Damke
Abstract
This Study Includes The Re Modified Minimum Moment Method Of Resource Levelling To Construction Projects. The Method Is Based Upon The Critical Path Method & It Was Developed With The Assumption Of No Activity Splitting And Fixed Project Duration With Unl