Impact Factor
7.883
Call For Paper
Volume 12 Issue 10
October 2026
Author(s)
Jomin P Jose Annie Sonia Xavier
Abstract
Construction Cost Overrun In Construction Projects Which Leads To Deliver Projects Within Time And Cost. In Order To Find Mitigation Measures Of Cost Overruns, The First Step Is To Identify The Causes Of These Overruns. This Paper Assesses The Causes Le
Keywords
Cost Overrun
Bayesian Belief Network
Paper ID
IJSARTV4I523546
Publication Date
May 15, 2018
Research Area
Civil Engineerig