STUDY ON COMPARISON BETWEEN PREFABRICATED AND CONVENTIONAL STRUCTERE |
Author(s): |
Suraj kanase |
Keywords: |
Precast concrete, conventional, cost & time analysis. |
Abstract |
The growth of Indian construction is going to become a fast to fulfill the need of future generation, time effective and achieving advance technique. The paper based on time comparison of precast concrete vs. cast-in-place (i.e. traditional) concrete. How total time of construction by precast concrete system is less than the time by use of cast-in-place concrete. Time of any construction is directly varied with cost of construction. The time required for steel binding, shuttering, concreting then time required for curing will be minimize (7 days).The Precast is manufactured in factory (i.e. in controlled environment) with required quality, easily mix, and cure till achieved good quantity with desired strength. Precast concrete is manufactured in factory and transport to site. |
Other Details |
Paper ID: IJSARTV Published in: Volume : 7, Issue : 5 Publication Date: 5/1/2021 |
Article Preview |
Download Article |