Call For Paper

Volume 10 Issue 4

April 2024

Submit Paper Here
Download Paper Format
Copyright Form
NEWS & UPDATES
News for Authors:

We have started accepting articles by online means directly through website. Its our humble request to all the researchers to go and check the new method of article submission on below link: Submit Manuscript

Follow us on Social Media:

Dear Researchers, to get in touch with the recent developments in the technology and research and to gain free knowledge like , share and follow us on various social media. Facebook

title

FLOW AND PRESSURE CALIBRATIONS IN THE KABINI COMMAND AREA’S BULK FLOW WATER SYSTEM– A MEANS TO ACCOMPLISH 24X7 WATER SUPPLY

Author(s):

Thanushree S

Keywords:

Flow calibration, Pressure calibration, Bulk flow meter, Pressure gauge, Flow pattern, Kabini Bulk supply system, 24 x 7 water supply

Abstract

Calibration is a process wherein the results of a model are compared with field observations [1]. This paper focussed on Calibration of the Kabini bulk water supply system from which the water is supplied to several District Metered Areas (DMAs) of Mysore city. Kabini bulk supply system supplies water to totally 16 DMA’s of Mysore and regions of Dattagalli, MUDA Layout and Bank Colony. On an average 62 MLD of water is delivered from this bulk system. Calibration was done considering mainly two parameters; flow and pressure. The field observations were compared with the original design and the factors causing the fluctuations in flow and pressure were identified and studied.

Other Details

Paper ID: IJSARTV
Published in: Volume : 3, Issue : 8
Publication Date: 8/2/2017

Article Preview




Download Article