Impact Factor
7.883
Call For Paper
Volume: 11 Issue 02 February 2025
LICENSE
Factors Affecting Cost Overrun In Kerala Based Construction Project
-
Author(s):
Jomin P Jose | Annie Sonia Xavier
-
Keywords:
Cost Overrun, Bayesian Belief Network
-
Abstract:
Construction Cost Overrun In Construction Projects Which Leads To Deliver Projects Within Time And Cost. In Order To Find Mitigation Measures Of Cost Overruns, The First Step Is To Identify The Causes Of These Overruns. This Paper Assesses The Causes Le
Other Details
-
Paper id:
IJSARTV4I523546
-
Published in:
Volume: 4 Issue: 5 May 2018
-
Publication Date:
2018-05-15
Download Article