Impact Factor
7.883
Call For Paper
Volume: 11 Issue 01 January 2025
LICENSE
Waste Minimization Of Steel Using Bbs Module
-
Author(s):
Ashwini Patil | Shraddha Syal
-
Keywords:
Steel, Bar Bending Schedule, Minimize Wastage, Scrap, Cut-off Lengths
-
Abstract:
Today, In Modern Times, Attempts Are Made To Integrate Various Departments In A Project To Avoid Duplication Of Information, Avoid Errors, Keep Track Of The Money And Efficient Management. The Major Material Used In Construction Project Is Steel. Cost Of
Other Details
-
Paper id:
IJSARTV3I1017631
-
Published in:
Volume: 3 Issue: 10 October 2017
-
Publication Date:
2017-10-16
Download Article