Impact Factor
7.883
Call For Paper
Volume 10 Issue 12 December 2024
LICENSE
USING TIME AND METHOD STUDY TO IMPROVE MANUFACTURING OF TUBULAR HEATERS
-
Author(s):
Mr. Gokul G | Mr pr Dheeraj
-
Keywords:
Time Study, Method Study, Two Handed Process Chart, Multiple Activity Chart.
-
Abstract:
In The Modern Era Of Fast And Upcoming Global Competition In Each And Every Industry For Getting Better And Better To Serve The Customer Not Just With The High Quality Products But Also At A Quicker Time So That The Next Time The Customer Looks For Quick
Other Details
-
Paper id:
IJSARTV6I738076
-
Published in:
Volume: 6 Issue: 7 July 2020
-
Publication Date:
2020-07-06
Download Article