High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

TIME-COST AND RESOURCE OPTIMISATION OF RESIDENTIAL CONSTRUCTION WORKS USING SPSS SOFTWARE

  • Author(s):

    R.Santhosh Kumar | B.Bagyasree

  • Keywords:

    Time-cost , Optimisation , Factors Causing Delays And Overrun.

  • Abstract:

    The Main Objective In The Construction Field Is To Complete Each And Every Project On Time, With Good Quality And Within The Estimated Cost. In The Construction Projects Time-cost And Resources Are The Most Crucial Factors To Be Considered In The Planning

Other Details

  • Paper id:

    IJSARTV5I532640

  • Published in:

    Volume: 5 Issue: 5 May 2019

  • Publication Date:

    2019-05-30


Download Article