High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

STUDY ON TIME SPACE MANAGEMENT IN WORK ZONE ON NH7 STRETCH BETWEEN JAGIR AMMAPALAYAM TO SEELANAICKENPATTI

  • Author(s):

    Venkatesh G | Prabhavathi S

  • Keywords:

    Time Space Traffic Management, SPSS, Transportation Management Plan.

  • Abstract:

    The Purpose Of This Investigation Is To Find Out The Various Problems Involved In The Highways Due To The Setting Up Of The Work Zones At The Various Points In The Particular Section Of The Road. Time Space Management Is The Major Concern In Road Cons

Other Details

  • Paper id:

    IJSARTV2I118044

  • Published in:

    Volume: 2 Issue: 11 November 2016

  • Publication Date:

    2016-11-21


Download Article