Impact Factor
7.883
Call For Paper
Volume 10 Issue 12 December 2024
LICENSE
STUDY OF METHOD'S TO REDUCE WASTE DUE TO REWORK AND CHECKING IT'S EFFECTIVENESS BY COST TIME ANALYSIS: CASE STUDY AT HADAPSAR PUNE
-
Author(s):
Desai Pradnya Ashok | Patil Satyajit B.
-
Keywords:
-
Abstract:
Rework In Construction Projects Is Mainly Stated As The Repetition Of Activity Or Wasting Unnecessary Efforts For Redoing Same Process Or Activity, Which Was Incorrectly Implemented In First Instance. Rework Can Adversely Affect The Performance, Productiv
Other Details
-
Paper id:
IJSARTV5I733051
-
Published in:
Volume: 5 Issue: 7 July 2019
-
Publication Date:
2019-07-22
Download Article