High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume: 11 Issue 02 February 2025


Download Paper Format


Copyright Form


Share on

Study Of Factors For Cost Overrun In Road Construction Projects

  • Author(s):

    Amol A. Shinde | Pravin Minde

  • Keywords:

    Cos Toverruns; Cost Time Figures ;hierarchy.

  • Abstract:

    The Subject Of Project Cost And Time Over-run Has Presently Dragged A Widespread Attention Of Project Managers And The Other Project Related Personnel. An In-depth Study And Critical Analysis Of Cost-time Figures Might Be Able To Decide Whether The Outwar

Other Details

  • Paper id:

    IJSARTV4I623915

  • Published in:

    Volume: 4 Issue: 6 June 2018

  • Publication Date:

    2018-06-03


Download Article