High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume: 11 Issue 02 February 2025


Download Paper Format


Copyright Form


Share on

Study Of Factors For Cost Overrun In Road Construction Projects

  • Author(s):

    Mr. Pranav K. Lende | Prof. Aradhana D. Rathod

  • Keywords:

    Cos Toverruns; Road Construction Projects ; Quantitative Density ; Time And Quality.

  • Abstract:

    India Has A Road Network Of Over 4,236,000 Kilometers In 2011, The Third Largest Road Network In The World. At 0.66 Km Of Roads Per Square Kilometer Of Land, The Quantitative Density Of India's Road Network Is Similar To That Of The United States (0.65) A

Other Details

  • Paper id:

    IJSARTV4I422194

  • Published in:

    Volume: 4 Issue: 4 April 2018

  • Publication Date:

    2018-04-01


Download Article