High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

STUDY & APPLICATION OF LINE OF BALANCE (LOB) METHOD FOR MIVAN CONSTRUCTION IN RESIDENTIAL PROJECT

  • Author(s):

    Mr. Trahash K. Matey | Col. B. K. Bhonde Asst. Prof. | Asst . Prof. Sudhanshu Pathak

  • Keywords:

    Line Of Balance (LOB); Repetitive Nature; Scheduling; Flow Line Chart, Gantt Chart.

  • Abstract:

    Linear Scheduling Methods Is Best Suited To Projects That Display Repetitive Characters But Their Use In The Construction Industry Is Limited. Line Of Balance Is Linear Scheduling Method That Also Makes Use Of Network Technology. The Line Of Balance Metho

Other Details

  • Paper id:

    IJSARTV3I615572

  • Published in:

    Volume: 3 Issue: 6 June 2017

  • Publication Date:

    2017-06-07


Download Article