Impact Factor
7.883
Call For Paper
Volume 10 Issue 12 December 2024
LICENSE
STAGE-WISE STUDY OF CONSTRUCTION DELAY AND COST OVERRUN IN BRIDGE CONSTRUCTION PROJECTS
-
Author(s):
Jyothish Chandran J | Mobin Raj.T | T.R. Sethuraman
-
Keywords:
-
Abstract:
Most Of The Bridge Construction Projects Are Reportedly Failing Across All The Key Performance Measures Including Cost, Time And Quality Performances. Construction Delay And Cost Overrun Is The Important Two Problems Faced By The Bridge Construction Indus
Other Details
-
Paper id:
IJSARTV8I856703
-
Published in:
Volume: 8 Issue: 8 August 2022
-
Publication Date:
2022-08-12
Download Article