Impact Factor
7.883
Call For Paper
Volume 10 Issue 12 December 2024
LICENSE
REVIEW OF METHOD FOR PREDECTIN ULTIMATE PULL OUT CAPACITY OF PILE
-
Author(s):
Kapil Prajapati | Sunil Rangari
-
Keywords:
Pullout Capacity, Pile, Uplift, Vertical Displacement, Shaft Friction
-
Abstract:
Pile Foundations Are Generally Used To Transmit The Superstructure Loads To Deeper Strata When The Subsurface Soil Is Of Inadequate Strength. High Rise Structures Supported By Piles Need Analysis For Lateral Loading Due To Earthquake And Wind. Piles A
Other Details
-
Paper id:
IJSARTV3I1117816
-
Published in:
Volume: 3 Issue: 11 November 2017
-
Publication Date:
2017-11-05
Download Article