High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

RESIDENTIAL PROJECT SCHEDULING AND COSTING USING BIM

  • Author(s):

    Komal T. Bharekar | Prof. Sagar Ambure

  • Keywords:

    Planning, Scheduling, Costing, BIM Execution, Revit Architecture, 5D Etc.

  • Abstract:

    Construction Organizations Run With Different Departments Such As Planning, Estimation, Contracts, Billing & Site. Number Of Construction When Visited And Studied It Was Found That There Is Lack Of Communication And Information Flow Among The Departmental

Other Details

  • Paper id:

    IJSARTV5I632679

  • Published in:

    Volume: 5 Issue: 6 June 2019

  • Publication Date:

    2019-06-03


Download Article