OPTIMIZING ALLOCATION OF RESOURCES OF RESIDENTIAL BUILDING
-
Author(s):
Nikita Sonar
-
Keywords:
Resource Improvement Coefficient,Earliest Start Time Etc.
-
Abstract:
Study Includes The Remodified Minimum Moment Method Of Resource Levelling To Construction Projects. The Method Is Based Upon The Critical Path Method & It Was Developed With The Assumption Of No Activity Splitting And Fixed Project Duration With Unlimited