High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume: 11 Issue 01 January 2025


Download Paper Format


Copyright Form


Share on

Improvement Of Lead Time In Air Compressor Manufacturing Sme Using Value Stream Mapping

  • Author(s):

    Manikanda Prasath K | Ezhil M

  • Keywords:

    Small Medium Enterprises (SME), Value Stream Mapping (VSM), Lean Manufacturing (LP), Non Value Added Activities (NVA), Value Added Activities (VA)

  • Abstract:

    Indian SME’s Find It Difficult To Boost Customer Satisfaction. These Days, Every Manufacturing Business Aims To Boost Productivity While Cutting Waste That Arises During The Production Of A Product. The Lean Mindset Is Very Focused On Cutting Waste. Lean

Other Details

  • Paper id:

    IJSARTV10I590880

  • Published in:

    Volume: 10 Issue: 5 May 2024

  • Publication Date:

    2024-05-06


Download Article