High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

IMPROVEMENT IN PRODUCT MANUFACTURING LEAD TIME BY ELIMINATING WASTE THROUGH VALUE STREAM MAPPING: A CASE STUDY

  • Author(s):

    Lokesh Pal | Ashish Yadav | Satish Sharma

  • Keywords:

    Value Stream , Production Time, NVA Activities, Future State Diagram, Current State Diagram

  • Abstract:

    VSM Is A Tool Which Includes Phases Of Production Line Is Used To Transform The Raw Material Into The Desired Finished Product. A VSM Observed All The Activities Through Which The Material Transformed Into The Final Product. VSM Use To Provide The Detaile

Other Details

  • Paper id:

    IJSARTV9I258186

  • Published in:

    Volume: 9 Issue: 2 February 2023

  • Publication Date:

    2023-02-12


Download Article