High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

IMPLEMENTATION TPM AT SEWING MACHINE SHOP & ESTIMATING EQUIPMENT EFFECTIVENESS

  • Author(s):

    M. Mohamed Azhar | M. Balaji

  • Keywords:

    TPM, Machine Downtime, Preventive Maintenance

  • Abstract:

    This Paper Represents A Novel Design And Control Architecture Of The Continuous Stirred Tank Reactor (CSTR) Based On Its Mathematical Equivalent Modeling Of The Physical System. The Plant Is Formed Analytically For The Normal Operating Condition Of CSTR.

Other Details

  • Paper id:

    IJSARTV9I769211

  • Published in:

    Volume: 9 Issue: 7 July 2023

  • Publication Date:

    2023-07-03


Download Article