High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume: 11 Issue 01 January 2025


Download Paper Format


Copyright Form


Share on

Implementation Of Bim In Residential Building For The Optimization Of Time, Cost And Quality

  • Author(s):

    Mayuri H. Shirsath | Col B. K. Bhonde | Mrs. Ashwini R. Patil

  • Keywords:

    BIM, Delays, Visualization, Construction Project, Cost Overrun

  • Abstract:

    With The Developing Country The Tools Of The Construction Also Have To Be Developed. The Construction Project Is Information Plays An Important Role In Project. The Level Of S Accuracy And Detailing At Each And Every Stage Of A Construction Project Is Req

Other Details

  • Paper id:

    IJSARTV4I724414

  • Published in:

    Volume: 4 Issue: 7 July 2018

  • Publication Date:

    2018-07-14


Download Article