High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume 10 Issue 12 December 2024


Download Paper Format


Copyright Form


Share on

IMPLEMENTATION OF BIM IN RESIDENTIAL BUILDING FOR THE OPTIMIZATION OF TIME, COST AND QUALITY

  • Author(s):

    Mayuri H. Shirsath | Col B. K. Bhonde | Mrs. Ashwini R. Patil

  • Keywords:

    BIM, Delays, Visualization, Construction Project, Cost Overrun

  • Abstract:

    With The Developing Country The Tools Of The Construction Also Have To Be Developed. The Construction Project Is Information Plays An Important Role In Project. The Level Of S Accuracy And Detailing At Each And Every Stage Of A Construction Project Is Req

Other Details

  • Paper id:

    IJSARTV4I724414

  • Published in:

    Volume: 4 Issue: 7 July 2018

  • Publication Date:

    2018-07-14


Download Article