Impact Factor
7.883
Call For Paper
Volume: 11 Issue 02 February 2025
LICENSE
Fidic And Its Apllication In Extension Of Time And In Disputes And Arbitration
-
Author(s):
Katravath Kavya Nayak | Sushil Kulkarni | Aditi Sonawane
-
Keywords:
FIDIC,DAAB, EOT, Contract, CEAI, NACE, Etc.
-
Abstract:
Study Of Need Of FIDIC Like Structured Contract Book In India For Different Types Of Works In Construction Industry Of India. Extension Of Time For Completion Clause Will Be Studied Has It Is Needed Due To Delays Are Caused By Having Much Larger Member Of
Other Details
-
Paper id:
IJSARTV8I1156979
-
Published in:
Volume: 8 Issue: 11 November 2022
-
Publication Date:
2022-11-24
Download Article