Call For Paper

Volume 10 Issue 4

April 2024

Submit Paper Here
Download Paper Format
Copyright Form
NEWS & UPDATES
News for Authors:

We have started accepting articles by online means directly through website. Its our humble request to all the researchers to go and check the new method of article submission on below link: Submit Manuscript

Follow us on Social Media:

Dear Researchers, to get in touch with the recent developments in the technology and research and to gain free knowledge like , share and follow us on various social media. Facebook

title

HYBRID POWER GENERATION FOR RURAL ELECTRIFICATION AND MONITORING OVER WITH IOT

Author(s):

Mr.M.Gangadhara Rao

Keywords:

Abstract

The project aims at developing a system which makes use of wind and solar energy for rural electrification. Wind and solar energy is treated as non renewable source of energy. This system also monitors the source availability and power generation on LCD and monitor over IOT (Internet of Things) Application. By using this project we can produce natural energy for rural areas and also we can monitor the power generation and source availability from remote location.Wind and solar energy has been used since the earliest civilization to grind grain, pump water from deep wells, and power sailboats. Wind-mills in pre-industrial Europe were used for many things, including irrigation or drainage pumping, grain-grinding, saw-milling of timber, and the processing of other commodities such as spices, cocoa, paints and dyes, and tobacco. Before the U.S. installed an infrastructure of electricity wires, both water-pumping windmills and small wind electric turbines were vital to farming and developing the American Great Plains and west. In recent decades, the industry has been perfecting the wind turbine to convert the power of the wind into electricity. The wind turbine has many advantages that make it an attractive energy source, especially in parts of the world where the transmission infrastructure is not fully developed. It is modular and can be installed relatively quickly, so it is easy to match electricity supply and demand.

Other Details

Paper ID: IJSARTV
Published in: Volume : 5, Issue : 5
Publication Date: 5/1/2019

Article Preview




Download Article