High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume: 11 Issue 01 January 2025


Download Paper Format


Copyright Form


Share on

4d Bim Implementation For Construction Of Multi-storeyed Residential Building

  • Author(s):

    Gaurav Bhamre | Ashvini Patil | Smita Pataskar

  • Keywords:

    AEC, BIM, 4D, Coordination, Clash Detection, Monitoring, Cost Optimization,Methodology, Scope

  • Abstract:

    Building Information Modelling(BIM) Has Recently Emerged As A Highly Efficient Solution For Information Management In Architecture, Engineering And Construction(AEC) Industry. Clash Detection Tool Is An Application Of BIM Which Is Used For The Coordinatio

Other Details

  • Paper id:

    IJSARTV3I615866

  • Published in:

    Volume: 3 Issue: 6 June 2017

  • Publication Date:

    2017-06-28


Download Article